Machinery Import Customs Clearance China Old Equipment Rules
Machinery import customs clearance China. Used machinery CCIC pre shipment inspection, new vs used routing, HS codes, CCC certification, duty and VAT. Send your machine specs.
By SeeHog Logistics editorial team

Nothing delays a machinery import customs clearance China more than treating a used machine like a new one. The two routes share almost nothing. A new machine is largely a documentation and classification exercise, while a used machine adds a pre shipment inspection regime that must be completed before the vessel is booked. Identify which route you are on first, because everything else follows from it.
New machinery is decided by classification and certification. Most machinery falls under HS chapters 84 and 85, and the specific heading drives your duty rate, your control conditions and whether inspection applies. Where the machine or its electrical components fall within the CCC catalogue, a China Compulsory Certification certificate must be held before import, and this is the single most common reason new equipment is held. Machinery containing refrigerant, such as chillers, air conditioning units and some heat pumps, additionally requires Ozone Depleting Substance import quota and licence, and the refrigerant type must be declared. Pressure vessels and boilers carry their own safety supervision requirements. Confirm the HS code and control conditions before you order, not after the machine arrives at port.
Used machinery requires a pre shipment inspection certificate, and this cannot be done after arrival. Under the commodity inspection regime, used mechanical and electrical products are subject to pre shipment inspection by a designated institution, and the resulting certificate must be presented at declaration. The inspection covers safety, health, environmental protection, the presence of prohibited items, and whether the machine has been dismantled, refurbished or assembled from scrap parts. Machines that are severely aged, obsolete, or that fail to meet Chinese safety and energy efficiency standards will be refused entry and the importer bears the cost of return shipment. Because this inspection happens overseas, it must be arranged at origin before loading, which is why lead time planning matters more here than anywhere else in the process.
The declaration itself demands accurate technical description. Machinery declaration elements typically include the brand, model, function, application, working principle, power rating, weight and, for used goods, the year of manufacture and usage history. Declaring a used machine as new to avoid inspection is a declaration violation that can trigger penalties and, in serious cases, criminal referral. Where the machine is imported for a specific project or as part of a foreign investment, preferential duty treatment may be available, but it requires the relevant project approval documents to be in place before declaration.
Packing and transport planning deserve attention. Machinery is usually shipped in wooden crates, and any wood packaging material must carry the ISPM 15 heat treatment or fumigation mark, otherwise the whole consignment can be rejected at the port. Oversized or overweight items need lifting and transport arrangements confirmed in advance, and machines with sensitive electronics or precision spindles should be desiccated and vibration protected. Where the machine must be dismantled for shipping, photograph and label every connection point, because reassembly errors at the Chinese end cost more than the freight saving.
Tax position depends on heading and origin. Import VAT is generally thirteen percent. Duty rates vary widely across chapters 84 and 85, and many industrial machines qualify for reduced or zero duty under RCEP or other free trade agreements where a valid certificate of origin is presented. Some categories also attract consumption tax. Getting the certificate of origin right at origin is often the largest single saving available, so it should be requested from your supplier before shipment rather than chased afterwards.
Documentation should be assembled as a complete set before arrival. At minimum you will need the commercial invoice, packing list, bill of lading, contract, certificate of origin, CCC certificate where applicable, ODS licence where applicable, and for used machinery the pre shipment inspection certificate plus the year of manufacture. Incomplete documentation is the most avoidable cause of delay, and each missing document typically costs two to three working days.
Send us the machine name, HS code if known, whether it is new or used, year of manufacture, technical specifications, power rating, weight, dimensions, whether it contains refrigerant, and country of origin. We will tell you which route applies, whether CCC or an ODS licence is needed, whether the machine can pass pre shipment inspection, what duty and VAT to expect, and how long the whole clearance will take. Email us or add WhatsApp +86 15221865538 and we will return a written import feasibility assessment for your specific machine before you commit to purchase.